Demolition
Clearance of all floor tiles, skirting, all furniture, entrance door, room doors, kitchen door, bathroom door and frame, wall tiles, kitchen units, bathroom units, brick walls, wall cabinets, aluminum panel ceiling
Electricity & Plumbing
Copper water supply pipes, plastic drain pipes, electrical wires, electric distribution cabinet and electricity meter (materials & work included)
[Whole house install wall hidden electric pipe with switches and sockets, total not less than 25 units, light switch uses “SCHNEIDER” Series]